Mosaic finished product maintenance

发布日期:2020-03-06 14:52 浏览次数:

1. Check the details: After all the wall surface is pasted, after the bonding layer is finally set, after the joint is finished, check again, and the floating sand left in the seam can be gently brought out with a clean moist soft brush. The excess of the rice strips should be flattened with 1:1 cement mortar and then wiped with a cloth. The bonding layer and the jointing mortar are cleaned after final setting.


 
2, do a good job: after the mosaic paving is completed, pay attention to the protection of the finished product, and can be properly dried. In the freshly finished surface layer, the sun should be avoided. The room should be properly ventilated and kept until about 24 hours after the delivery. Generally, the post-laying of the mosaic should be no less than 7 days.


 
3. Clean: After the bonding layer and the jointing mortar are finally set, the mosaic surface can be cleaned. To clean the work, you need to prepare two buckets, one with new detergent and one with clean water. First, soak the rag in the bucket containing the detergent, do not wring it out, then wipe the mosaic surface in a circular motion: then in the second Soak the sponge in a clean bucket, then wipe the mosaic surface with a sponge and wipe off any residue. Finally, once again wipe the surface with a sponge until it is clean

更多>>

推荐新闻

XChina glass mosaic tiles,stone mosaic tiles,ceramic mosaic tile.

Wechat code

WhatsApp/Mobile : +86-13929149495

(Copy whatsapp num by click)

  Open Wechat

WHATSAPP NUMBER ALREADY COPIED !